Foam Concrete Pump Machine

1. Simple construction operation, from the material, adds water, mixing mixture of foam, and transport combined with one machine.
2. The amount of foam can be precisely controlled to milligrams, good foaming effect, and uniform foam.

Send Inquiry Chat Now

LH-30YB-20 foaming machine

image001(001)

1. Simple construction operation, from the material, adds water, mixing mixture of foam, and transport combined with one machine.

2. The amount of foam can be precisely controlled to milligrams, good foaming effect, and uniform foam.

3. The use of high-pressure foam, foam quality, not broken 

4. With high efficiency, the single machine can do construction area of 1000-1500 square meters / day. 

5. Light weight, small size, easy to move, stand-alone does not exceed 300 kg. Can combine to form a large construction capacity 

6. But also can undertake small projects, is the ideal equipment for the universal foam cement construction.

7. Machine compatibility, currently on the market a variety of foaming agent foam can meet different process requirements of foam specifications. Adjust the settings according to different models, different proportion of foaming agent and construction requirements. Select the item definitions of the type of insulation requirements, thus ensuring the bulk density ratio can be optionally between 180kg-1600kg 

8 Its price is cheap, reducing the threshold for the use of the foam machine, so that any business purchased from the 

9. Pumping height, vertical transport of 60-120 meters high (equivalent to 30 floors)

image003

image004(001)


image006(001)


What should you pay attention to when using cement foaming machine?

***Requirements for heat transfer coefficient. Foamed cement is used as the heat insulating layer, and there is no data to check the thermal conductivity correction coefficient. Therefore, the thickness of the foamed cement cannot be calculated according to the heat transfer coefficient of not more than 1.2 W/(m2·K). If the correction factor is calculated as 1, the foamed cement thickness of 40 mm can meet the requirements, but the thermal conductivity correction factor should be a number greater than 1.

 

*** Requirements for laying the heating pipe spacing. The aluminum foil layer is reduced, and the spacing is not well grasped when the heating tube is laid. After the foamed cement is molded, the surface of the foamed cement is subjected to a check.


Hot Tags: foam concrete pump machine, suppliers, manufacturers, discount, price, for sale
Related Products

Copyright © Wenzhou Engineering Machinery Co.,Ltd All Rights Reserved.